The work, in numbers.
Across five divisions and dozens of live UK sites, every contract generates a compliance record. These case studies are drawn from that record, not from marketing copy.
Proof you can put in front of an evaluator.
shown

Ernest Jones and H Samuel: decorating and cleaning for Signet
AOG is the single partner behind two service lines across Signet's UK jewellery brands: decorating for H Samuel on three projects from Stoke to Cornwall, and the builders and sparkle clean for Ernest Jones across a nationwide 48-store rollout with Barnwood Shopfitting. One standard, two disciplines, the same high-street retail estate.
Get this case study as a PDFRead case study →
Priors Hall Park, Corby
Six years of multi-service support on a major strategic residential development.
PDFRead case study →
Hartpury University: the Graze building, cleaned to open
AOG delivered a high-level, external and internal builders and sparkle clean of Hartpury University's new Graze dining and teaching building over several weeks, working alongside the main contractor ahead of opening.
Read case study →
Bridgeside Luna: settling students into a new build, Nottingham
AOG cleaned every floor of Bridgeside Luna's new Nottingham building, inside and out, ran fire marshalling through the move-in period, and worked alongside the Luna team to welcome and settle students in, with the same team on site consistently for over two months.
PDFRead case study →
Symmetry Park: security across two warehouses
At a Symmetry Park logistics development of two warehouses, AOG provided far more than a gateman. The crew combined gate and access control with traffic marshals and dedicated night security, alongside construction-support labour of three labourers and two dumper operatives, keeping the site secure and the build resourced from one operator.
PDFRead case study →
Blenheim Park, Nottingham: builders clean across three warehouses
A three-unit warehouse development at Blenheim Park in Nottingham needed a full builders clean, externals, internals and high-level cleaning, across all three buildings, plus a sparkle clean handover in each office once its builders clean was complete. AOG ran the programme across six weeks, working around live fit-out trades and using high-level access equipment to reach what ladders could not.
PDFRead case study →
Buckingham Palace: three years of refit cleans
Each time the Buckingham Palace gift shop was renewed and refitted, it had to reopen to visitors ready to trade. AOG delivered the builders and sparkle clean across three consecutive years, returning each time the shop was refreshed, with a security-vetted team throughout and methods chosen to protect delicate display artefacts and new fixtures.
PDFRead case study →
Cheltenham College: College Lawn boarding house, cleaned to occupancy standard
AOG delivered a high-level, external and internal builders and sparkle clean of Cheltenham College's new College Lawn boarding house and House Mistress dwelling over several weeks, working alongside the main contractor ahead of occupancy.
Read case study →
Royal Mail hub, Rugby: one operator, 3.5 years
At a major Royal Mail distribution hub near Rugby, AOG delivered a genuinely multi-division contract over three and a half years. From one operator the site drew gate manning and security, welfare, cleaners and COVID marshals, alongside site operatives and dumper drivers, all coordinated under a single point of contact.
PDFRead case study →
Costa Coffee: 60 stores, zero accidents
Working through Barnwood Group, AOG has delivered the builders and sparkle clean on around sixty Costa Coffee stores over three years. Every store handed over ready to trade, on a repeatable programme, with a clean safety record across the whole run and not a single reportable accident.
Read case study →
Pizza Express: 26 stores, reopened overnight
Across a 26-store framework, AOG delivered post-refurbishment reopening cleans up and down the country, working overnight at each site so every restaurant could open to customers the very next morning.
Read case study →
Whistl: a four-week warehouse builders and high-level clean
A newly built Whistl distribution warehouse at Cribbs Causeway in Bristol needed a full builders and sparkle clean, including high-level cleaning and cladding, using Space-Vac systems and industrial jet washing, to move from construction site to operational facility over four weeks.
Read case study →
Coventry Building Society: a 20+ unit framework
AOG ran a national framework for Coventry Building Society covering more than twenty units, supporting shop-fitting, handovers, and delivery across the estate. That regional programme led to a circa two-month engagement at the headquarters of the mutual, which serves around two million members, cleaning the building inside and out at the close of works.
PDFRead case study →Seen enough to start a conversation?
Every study on this page started with a 20-minute scope call. Tell us the site, the division and the timeline. We come back with a method statement and price schedule within 48 hours.