Site Set-up and Close-down
Construction Support · Site Set-up and Close-down

Site Set-up and Close-down

Hoarding, signage, compound set-up and full close-down at programme end, including dilapidation surveys and handover-ready clean.

Cover
Set-up and close-down
Mobilisation
From 14 days
Coverage
UK-wide
Reporting
Per-phase · per-site
Home/Divisions/Construction support/Site Set-up and Close-down
Hoarding, signage, compound, dilapidation.

Site set-up and close-down, run inside the AOG operating model.

Site set-up and close-down sits inside the same AOG account as security, FM and vacant property. One project manager owns the contract. One control room holds the schedule, the inductions and the daily reports. One weekly report goes back to the main contractor.

You take the service on its own, or alongside the rest of the construction-support division. The covenant, the compliance ledger and the point of contact stay the same either way.

Site mobilisation and demobilisation for construction programmes. Hoarding and perimeter, welfare and compound set-up, statutory signage and wayfinding, pre-start and post-completion dilapidation surveys, and handover-ready clean at programme end.

At a glance

Cover
Set-up and close-down
Mobilisation
From 14 days
Coverage
UK-wide
Reporting
Per-phase · per-site
What it covers

The work, line by line.

Every line is delivered against written assignment instructions and reported into the AOG weekly review.

Hoarding and perimeter

Hoarding install, signage, branding and perimeter access points.

Welfare and compound set-up

Welfare cabins, drying rooms, canteens and compound layout.

Signage and wayfinding

Statutory signage, wayfinding and visitor route boards.

Dilapidation surveys

Pre-start and post-completion dilapidation, with photo evidence.

Programme-end close-down

Full demobilisation, compound strip-out and handover-ready clean.

Waste segregation and removal

Compliant waste streams and licensed-carrier removal at strip-out.

What is included

Inside the service.

  • Hoarding and perimeter including install, signage, branding and perimeter access points
  • Welfare and compound set-up for welfare cabins, drying rooms, canteens and compound layout
  • Signage and wayfinding covering statutory signage, visitor route boards and wayfinding
  • Dilapidation surveys at pre-start and post-completion with full photo evidence
  • Programme-end close-down including full demobilisation, compound strip-out and handover-ready clean
  • Waste segregation and licensed-carrier removal at programme strip-out
Why AOG

What you get that you would not elsewhere.

Pre-start and post-completion dilapidation surveys protect the client from disputed damage claims

Hoarding, signage and compound set-up completed before operatives arrive so day one is productive

Handover-ready clean delivered as part of close-down, not as a separate instruction

Waste removal at strip-out uses licensed carriers with waste transfer notes held by AOG

Set-up and close-down under the same contract as welfare and logistics and security — one mobilisation

Statutory signage and wayfinding compliant with CDM 2015 requirements from day one

Where it is deployed

Sectors using Site Set-up and Close-down.

Proof

Operational, not aspirational.

100%
set-up and close-down items signed off against scope

Set-up and close-down run as projects, not afterthoughts.

Questions

Frequently asked questions

What support can AOG provide during site mobilisation?

Hoarding and perimeter installation, welfare and compound set-up, and statutory signage and wayfinding are completed before operatives arrive, so the site is productive from day one.

Can you support temporary welfare and access arrangements?

Yes. Welfare cabins, drying rooms, canteens and compound layout are set up as part of mobilisation, alongside the access points and signage the programme needs.

What is included in a site close-down?

Close-down covers full demobilisation, compound strip-out, waste segregation and licensed-carrier removal, and a handover-ready clean, alongside a post-completion dilapidation survey with photo evidence.

Can cleaning and security continue after construction teams demobilise?

Yes. Cleaning and security can continue into the operational phase under the same AOG management structure once construction-support labour and traffic management have demobilised.

How quickly can a site set-up team mobilise?

Typical mobilisation is from around 14 days, though this depends on the scale of the compound and welfare set-up required.

Talk to the construction team.

Tell us the site, the programme and the resource you need. We will come back with mobilisation and a price.